top of page

Case Studies

Case-Study-Macys-1024x791.jpg
Macy’s Herald Square

We designed and built a custom power distribution system as part of a $400 million top-to-bottom remodel of the iconic Macy’s store.

Quote 22 - Jerry DiCunzolo 3
Play Video
Radio City Music Hall

We developed a strategy for weighing the lobby chandeliers and delivered electrified hoists at a far lower cost than the alternative.

Case-Study-NY-Hospital-1024x791.jpg
New York Downtown Hospital

We upgraded aging BAC towers with an innovative in-place installation that eliminated the need to dismantle the old system.

Quote 23 - Gerry DiCunzolo 4
Play Video
Grand Central Station

We did the primary electric service for the East Side Access project to bring Long Island Railroad into Grand Central Station.

Case-Study-East-Brunswick-Water-300x231.
East Brunswick Water

We replaced a wound rotor motor with a state of the art VFD drive and designed controls to fit into the existing cabinets.

Quote 19 - Mitchell Goldstein 3
Play Video
Second Avenue Subway

We developed custom switchgear to exacting code specifications and delivered it to the prime contractor.

Case-Study-Viscardi-Center-1024x791.jpg
The Viscardi Center

We did a turnkey energy-efficient lighting upgrade.

Quote 28 - Bob Bellini 3
Play Video
Water Pressure Emergency

We help a customer resolve a pressure booster pump failure that was impacting 7 buildings and 2,100 families.

Case-Study-Beth-Page-Library-1024x791 (1
Bethpage Library

We reduced cost by 33% on a major lighting upgrade.

Quote 20 - Mitchell Goldstein 2
Play Video
Emergency Onsite Repairs

We rectified equipment problems and helped a major project to stay on track.

Case-Study-Hurrincane-Sandy-Response-102
Hurricane Sandy

We get key systems back online in 48 hours.

bottom of page